Water Safety Design and Construction

Water Management Program

Establishing – and reviewing – your water management program is crucial for protecting everyone in your facility. 

Legionella and waterborne pathogen controls start during planning, continue into construction, and should be reviewed continually during the operational phase. New testing, control, mitigation, and remediation options are being developed continually, so your plan must be updated to keep pace. 

Water Management Team

The water management team is as important as a plan. This team should be composed of multiple disciplines. 

These cross functional teams are often made up of: 

Legionella Risk Factors

Legionella & Water Temperature 

Multibarrier Protection 

Multibarrier protection makes it more difficult for Legionella growth by adding barriers that either kill or filter the bacteria. Below are the main types of barriers that are ultilized to prevent Legionella outbreaks. 

Hot Water Loop Design 

Every facility has a different configuration and varying distances between the hot water supply and the many points of use. Many risk factors can emerge from overly long hot water loops and insufficient circulation. Even in facilities with these issues, there are solutions such as an automatic hot water loop control system. 

Piping Material Selection 

Not all piping materials are equal when it comes to Legionella prevention. Different piping materials have varying susceptibilities to biofilm growth and oxidation, which create differing levels of vulnerabilities for Legionella colonization.